Monday, December 08, 2008
Saturday, November 22, 2008
Repair of Ashbrook Hall continues into November
Work continues on the repair work in Ashbrook Hall. November weather allowed for the continued repair of the outside walls. Weathered siding was removed and replaced and the building was painted. The west wall is complete. The men were working on the east wall on this day.
Snow covered the ground on November 21 and the work moved indoors. The crew of three that day worked on redoing the west wall.
(Dan Corey and Pastor Hamilton do aerial areobatics while I take pictures and cut wood at ground level!)
The men stopped for another week... but work will continue.
The men stopped for another week... but work will continue.
Saturday, October 04, 2008
Monday, September 29, 2008
Wednesday, September 17, 2008
Wind Damage from "Hurricane Ike"
These pictures show some of the damage done from Sunday, September 14th's windstorm (leftovers from Hurricane Ike). Much clean-up had already occurred before these pictures were taken on Tuesday afternoon. Three cabins sustained some damage. Quite a number of trees were down and the grounds were littered with branches and twigs. The ground in front of Ashbrook Hall was covered with walnuts that fell prematurely during the storm.
This last picture shows the progress being made on the residing of Ashbrook Hall.
Sunday, September 07, 2008
Friday, August 29, 2008
Thursday, August 14, 2008
Tuesday, August 12, 2008